Cathy’s Bathroom

Want to know what we can do for you

Project

Total gut removed the existing tile walls, ceiling, and flooring. Installed new insulation and sheetrock. Installed a new silk stone tile shower, and new 36″ x 12″ wood tile on the bathroom floor. Installed new bathroom fixtures and toiletries. Installed new doors, window, and trim.  Primed and painted.

Date

June 15th, 2017

Project Type

June 15th, 2017

Share This