Iris Addition

Want to know what we can do for you

Project

Removed the 2nd floor for the installation of a new 2nd floor addition. The new addition consisted of a new master bedroom, master bathroom, 3 bedrooms, office, and one full bathroom. We installed new insulation, sheetrock, and doors and windows. Both bathrooms we tiled all three shower walls, custom floor, and bathroom flooring. Installed new bathroom fixtures and toiletries. We installed new oak steps (painted and stained) to lead up to the 2nd floor. Installed new carpet flooring throughout the 2nd floor. Installed new doors and trim, primed and painted entire addition. Installed new vinyl siding and architectural roofing. Install a new front porch (trex) with new black vinyl railings and handrails.

Date

June 15th, 2017

Project Type

June 15th, 2017

Share This