Mike’s Kitchen

Want to know what we can do for you

Project

Removed the existing tiles from the walls, ceiling, and floor. Patched and repaired walls (that were disturbed during the demo), created new arch-way leading into the existing dining room. Installed new tile flooring through out the kitchen. Installed new lighting (recess/independent), under cabinet lighting, and new switches on dimers. Installed new cabinets (soft-close feature), back splash, and new counter tops. Primed and painted walls, ceiling, doors, and trim.

Date
June 15th, 2017
Project Type
June 15th, 2017
Share This